|
|
|
|
|
|
|
Leading Installation Notes |
Source£ºadmin Added£º2009-12-14 Click£º681 |
Leading Installation Notes: The heart has a leading factory testing and debugging, do not own Assembly and Disassembly! 2 Before installing faucet, be sure water is clear of impurities and cement within the sand in order to free blocked, affecting the water feature. 3 Please click the product installation size map to install to ensure that the installation is correct, not to force the installation, so as to avoid damage to the leading parts. 4 faucet with hot and cold water supply connections must be correct, the face of the lead, on the left then hot water, then cold water on the right. 5 faucet installed, check whether the connections throughout closely to ensure that the normal function of the water faucet. |
|
¡¾Print this page¡¿¡¾Close Window¡¿ |
|
|
|
|
|