°²Â깫˾»¶Ó­Äã!
Welcome to ANMA!
   
  News
 
Leading Installation Notes
Source£ºadmin   Added£º2009-12-14    Click£º681
Leading Installation Notes: The heart has a leading factory testing and debugging, do not own Assembly and Disassembly! 2 Before installing faucet, be sure water is clear of impurities and cement within the sand in order to free blocked, affecting the water feature. 3 Please click the product installation size map to install to ensure that the installation is correct, not to force the installation, so as to avoid damage to the leading parts. 4 faucet with hot and cold water supply connections must be correct, the face of the lead, on the left then hot water, then cold water on the right. 5 faucet installed, check whether the connections throughout closely to ensure that the normal function of the water faucet. 
¡¾Print this page¡¿¡¾Close Window¡¿    
 
 
 
Copyright  ¡¡Zhejiang An Ma Sanitary Ware Co., Ltd.¡¡  Address£ºLuPu Town XuanMen Industrial Zone, Yuhuan, Zhejiang, China¡¡    Design Maintenance£ºe-shidai
Phone£º+86-576-87502555¡¡  Fax£º+86-576-87503958¡¡  E-mail£ºanma@an-ma.com   Mail Sign in